It took less than one year to build Mauritius’ first solar park. Up to 15.2 megawatts of solar power will be produced at this 34-hectare site and fed into the local grid.
Meeting with TAUBER SOLAR
Visit at TAUBER SOLAR in Tauberbischofsheim, Tauberbischofsheim, Germany / founding of Sarako
Planning / Measuring / Analysing
Start of construction of Mauritius’ first solar park
Excavation
Technicians visit the TAUBER SOLAR GmbH Service Centre
Mauritians study solar park monitoring in Germany
Drilling and installation of the assembly system
Installation of the modules, laying cables, construction of the substation and connection facilities
Commissioning and testing
Connected to the grid on 18 February 2014